UNDERFLOOR AIR DISTRIBUTION (UFAD)

Raised Access Floor UFAD Testing

Until recently, Raised Access Floor UFAD Plenum Air Leakage Testing (PALT) has been an architectural event. Leakage rates were based on an installed linear footage calculation. In today’s LEED Certification, Green Building, and energy efficient World Market, UFAD is a full-blown MEP Event. We have perfected a quantifiable, accurate, and repeatable pressurization leakage testing and remediation protocol that stands up to the rigorous HVAC Commissioning UFAD pressurization installation requirements, both for new and existing UFAD installations. Our tailored approach and unique skill set has proven successful through numerous projects in the field of UFAD construction and installation. 

IMG_3354
IMG_4757
IMG_4760
IMG_3101
IMG_0361
IMG_3199
IMG_3193
Exxon Mobil

ExxonMobil Campus

Houston, Texas

  • 3.5 million sq. ft. of Installed Raised Access Floor 

  • UFAD PALT Testing and Remediation

ArcBest

ArcBest Corporate Headquarters

Ft. Smith, Ark.

  • 200,000 sq. ft. of Installed Raised Access Floor

  • UFAD PALT Testing and Remediation 

Blue Cross Blue Shield

Blue Cross Blue Shield

Columbus, Georgia

  • 235,000 sq. ft. of Installed Raised Access Floor

  • UFAD PALT Investigation and Troubleshooting

Suncoast Credit Union 2

Suncoast Credit Union

Tampa, Fla.

  • 108,000 sq. ft. of Installed Raised Access Floor

  • UFAD PALT Testing and Remediation 

Apple Campus 2

Apple Campus 2

Cupertino, California

  • 2.8 million sq. ft. of Installed Raised Access Floor

  • UFAD PALT Testing and Remediation  

FT GORDON

Ft. Gordon Arcyber Project

Ft. Gordon, Ga.

  • 250,000 sq. ft. of Installed Raised Access Floor

  • UFAD PALT Testing and Remediation